Line Boring Maintenance
In the yard at Alpha Contracting, central Queensland. This Caterpillar D8T is set-up for line boring. 25 tonne Composite Stands at 700 mm tall support the job whilst maintaining. They are lightweight and efficient.
With a composite “hard stand pad” (Outrigger) placed underneath the stand. Spreading the load over a wider area on the site pad. It also prevents point loading at the base. A perfect combination for working on the ground and in field service.
Composite Stands | GET YOUR GEAR OFF the ground